
The aim of the project was to investigate strategies for improving the wastewater treatment of the factory with constructed wetlands. As part of that project, eight pilot scale free-water surface wetlands were constructed to facilitate experiments with such systems. Those pilot scale wetlands will be used in the proposed study.
BOJCEVSKA, H. (n.y): Treatment performance of a free water surface constructed wetland system receiving sugar factory effluents in the Lake Victoria region. Linkoeping: University of Linkoeping URL [Accessed: 24.08.2011]