The main aim of the project was to avoid manual scavenging of excreta and to improve the sanitation situation at the Navsarjan Vocational Training Institute. The technical solution proposed was source separation (grey-/blackwater) and reuse. Greywater is separately treated and reused in the garden while the urine and faeces (blackwater) are directly introduced into a biogas plant. Digested sludge is dried on basic drying beds and used as compost for the garden. UDDT were also installed. The concept was implemented and evaluated for its social and cultural acceptability, sustainable and hygienic safety.
WAFLER, M. (2006): Chapter 3. Pilot Project "Navsarjan Vocational Training Institute Dalit Shakti Kendra". In: WAFLER, M. ; HEEB, J. ; (2006): Report on Case Studies of ecosan Pilot Projects in India. Eschborn: . URL [Accessed: 26.04.2010]